Mathematics, 17.04.2021 01:00, vanessapineda11
1. Give the rule for translating a point 4 units left and 8 units up.
Answers: 2
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 03:00, izeahzapata1
An object is accelerating at a constant rate. its velocity in feet per second as a function of time in seconds can be modeled by the linear function v(t) = 2.5t. what does the dependent variable represent for this function? a) acceleration b) distance c) slope d) velocity
Answers: 3
1. Give the rule for translating a point 4 units left and 8 units up....
Health, 18.03.2021 01:40
Mathematics, 18.03.2021 01:40
Mathematics, 18.03.2021 01:40
Mathematics, 18.03.2021 01:40
Mathematics, 18.03.2021 01:40
Chemistry, 18.03.2021 01:40