A does 1/2 of a piece of work in 3 1/2 hours B does 1/4 of the remainder in 1 1/2 hours and C then finishes the work in 5 1/4 hours. How long would it have taken the three working together to do the works

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, babygirl226
Acircular city park has a sidewalk directly through the middle that is 111 - feet long. if each bag of fertilizer covers 50 square feet, then determine how many bags of fertilizers the parks and recreation department needs to use to cover the circular park. ignore all the sidewalks around and through the park.
Answers: 1
image
Mathematics, 21.06.2019 16:00, kissesforlester7097
Given right triangle xyz, which correctly describes the locations of the sides in relation to
Answers: 1
image
Mathematics, 21.06.2019 22:00, jerrygentry3411
The figure shows the front side of a metal desk in the shape of a trapezoid. what is the area of this trapezoid? 10 ft²16 ft²32 ft²61 ft²
Answers: 2
image
Mathematics, 22.06.2019 01:30, b2cutie456
Drag the titles to the correct boxes to complete the pairs. the probability that kevin has diabetes and the test
Answers: 3
Do you know the correct answer?
A does 1/2 of a piece of work in 3 1/2 hours B does 1/4 of the remainder in 1 1/2 hours and C then f...

Questions in other subjects:

Konu
Mathematics, 06.10.2019 15:00