Mathematics, 01.04.2021 22:50, jocelynmarquillo1
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging
help/
Answers: 2
Mathematics, 21.06.2019 13:30, 22justinmcminn
Which equation represents a proportional relationship that has a constant of proportionality equal to 1/5
Answers: 1
Mathematics, 21.06.2019 21:00, arizmendiivan713
*let m∠cob = 50°30’, m∠aob = 70° and m∠aoc = 20°30’. could point c be in the interior of ∠aob? why?
Answers: 1
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Medicine, 11.09.2021 06:40
Mathematics, 11.09.2021 06:40
Computers and Technology, 11.09.2021 06:40
Mathematics, 11.09.2021 06:40
Mathematics, 11.09.2021 06:40
Mathematics, 11.09.2021 06:40
Biology, 11.09.2021 06:40