Mathematics
Mathematics, 01.04.2021 22:40, arwasoliman363

Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.

Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 02:00, mylanag12
Point a is at 12, and point d is at 56. point c is midway between a and d, and point b is midway between a and c. which of these is the coordinate of b?
Answers: 3
image
Mathematics, 22.06.2019 04:00, heavyhearttim
The perimeter of △cde is 55 cm. a rhombus dmfn is inscribed in this triangle so that vertices m, f, and n lie on the sides cd , ce , and de respectively. find cd and de if cf=8 cm and ef=12 cm. the answer is not cd=20 and de=15. i have tried that one, it does not work.
Answers: 1
image
Mathematics, 22.06.2019 04:30, Ryvers
The ordered pair (2,-5.2) is located in quadrant iv
Answers: 1
image
Mathematics, 22.06.2019 06:00, krystalhurst97
3. mr. sanchez’s class sold fruit pies for $1.65 each and mr. kelly’s class sold bottles of fruit juice for $1.36 each. together, the classes sold 79 items and earned $118.17 for their school. (a) write and solve a system of equations that model the problem. show all your work. (b) which class earned more money? (c) how much more money did that class earn?
Answers: 1
Do you know the correct answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...

Questions in other subjects:

Konu
History, 30.01.2020 23:47