it takes 8 builders 12 days to build a wall .How long will it take for 4 builders to build the same wall ?​

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, serenityburke
Acommunity group sells 2,000 tickets for its raffle. the grand prize is a car. neil and 9 of his friends buy 10 tickets each. when the winning ticket number is announced, it is found to belong to neil's group. given this information, what is the probability that the ticket belongs to neil? a.1/5 b.1/10 c.1/200 d.1/4
Answers: 2
image
Mathematics, 21.06.2019 18:50, babyskitt
Determine if the function below is continuous. a. continuous b. not continuous, 1 hole c. not continuous, > 2 holes d. not continuous, 2 holes
Answers: 1
image
Mathematics, 21.06.2019 22:10, bejaranobella07
This is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 4 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 3 terms. this is a rational expression because the denominator contains a variable. this is a polynomial with 5 terms.
Answers: 2
image
Mathematics, 21.06.2019 23:50, ri069027
What is the scale factor of two similar pyramids with volumes of 64 cubic feet and 8 cubic feet
Answers: 1
Do you know the correct answer?
it takes 8 builders 12 days to build a wall .How long will it take for 4 builders to build the same...

Questions in other subjects:

Konu
Mathematics, 03.12.2021 01:00
Konu
Chemistry, 03.12.2021 01:00