Mathematics, 30.03.2021 16:30, jaylene125
A construction company has to complete a project no later than 3 months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, 3.5. The manager currently thinks that the probabilities of these four possibilities are in the ratio 1 to 2 and 2 to 4. That is X = 2.5 is twice as likely as X = 2, and X = 3 is twice as likely as X = 2.5 and X = 3.5 is half as likely as X = 3.
1) Find the probability distribution of X. Hint: P(X = 2) = 0.111, P(X = 3) = 0.444
2) What is the probability that this project will not be completed on time?
3) What is the expected completion time in months?
4) How much variability (in months) exists around the expected value?
Answers: 3
Mathematics, 21.06.2019 15:00, wrightstephanie193
Which expression is equivalent to 2x^2+7x+4?
Answers: 3
Mathematics, 21.06.2019 19:00, wannaoneisforever
What numbers are included in the set of integers? what numbers are not included?
Answers: 2
Mathematics, 21.06.2019 19:00, mylittleponeyfbrarit
When keisha installed a fence along the 200 foot perimeter of her rectangular back yard, she left an opening for a gate. in the diagram below, she used x to represent the length in feet of the gate? what is the value? a. 10 b. 20 c. 25 d. 30
Answers: 1
A construction company has to complete a project no later than 3 months from now or there will be si...
Social Studies, 16.07.2019 19:10
Chemistry, 16.07.2019 19:10
Business, 16.07.2019 19:10
Mathematics, 16.07.2019 19:10