Mathematics
Mathematics, 29.03.2021 23:30, kaur16435

Prob(Total time in process > Td) = EXP(-Td/T) T = (1/(Rp - Ri)) = (1 / Rs) R = min(Ri, Rp) u=R/Rp Dominic runs an appliance repair shop and sells replacement parts for appliances to walk in customers. Customers take an average of 5 minutes. It is a single phase system with 1 server. The coefficient of arrivals and the coefficient of processing times is 1.0. If the total time a customer is in the system is 10 minutes, what is the probability that a customer will have more than 15 minutes in the system?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, charitysamuels
What is the equation of a vertical line passing through the point (βˆ’5, βˆ’1)? y = βˆ’5 y = βˆ’1 x = βˆ’5 x = βˆ’1
Answers: 2
image
Mathematics, 21.06.2019 17:10, ohartshorn3670
Consider the functions below. function 1 function 2 function 3 select the statement which is true about the functions over the interval [1, 2] a b function 3 has the highest average rate of change function 2 and function 3 have the same average rate of change. function and function 3 have the same average rate of change function 2 has the lowest average rate of change d.
Answers: 3
image
Mathematics, 21.06.2019 18:30, dria40
What is coefficient of the term of degree of degree 5 in the polynomial below
Answers: 1
image
Mathematics, 22.06.2019 00:00, cchave9563
Asequence is a function whose is the set of natural numbers
Answers: 1
Do you know the correct answer?
Prob(Total time in process > Td) = EXP(-Td/T) T = (1/(Rp - Ri)) = (1 / Rs) R = min(Ri, Rp) u=R/Rp...

Questions in other subjects:

Konu
Arts, 17.08.2021 18:00