Mathematics, 26.03.2021 17:30, montgomerykarloxc24x
The cost per hour of running an assembly line in a manufaturing plant is an equation of the number of items produced per hour. The cost of the function C = 0.3x^2 - 1.2x + 2 Where x is the number of items produced per hour in thousands and C is the cost per hour in thousands of dollars. Determine the minimum cost and the number of items that will be produced. Has to be solved by completing the square.
Answers: 2
Mathematics, 21.06.2019 16:30, ryleepretty
Quadrilateral ghjk has vertices g(2, 3), h(8, 2), j(6, 8), and k(3, 6). it is transformed according to the rule t(–4, –5). what are the coordinates of g”? (–7, 3) (–2, 2) (–1, –7) (2, –2)
Answers: 2
Mathematics, 21.06.2019 17:50, 27lcasselberry
Which of these triangle pairs can be mapped to each other using two reflections?
Answers: 1
The cost per hour of running an assembly line in a manufaturing plant is an equation of the number o...
Arts, 07.12.2020 22:20
History, 07.12.2020 22:20
Mathematics, 07.12.2020 22:20
Physics, 07.12.2020 22:20