Mathematics
Mathematics, 22.03.2021 21:20, anayamulay

A group of engineers developed a new design for a steel cable. They need to estimate the amount of weight the cable can hold. The weight limit will be reported on cable packaging. The engineers take a random sample of 46 cables and apply weights to each of them until they break. The 46 cables have a mean breaking weight of 779 lb. The standard deviation of the breaking weight for the sample is 15.4 lb. Find the 99% confidence interval to estimate the mean breaking weight for this type cable.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, SunsetPrincess
Solve this equation using substitution. {4x + y = −2} {4x + 6y = 44}
Answers: 1
image
Mathematics, 21.06.2019 21:30, marika35
Are the corresponding angles congruent? explain why or why not.
Answers: 2
image
Mathematics, 22.06.2019 00:30, jamiej231984
Two cities a and b are 1400km apart and lie on the same n-s line. the latitude of city a is 23 degrees. what is the latitude of city b. the radius of the earth is approximately 6400km.
Answers: 3
image
Mathematics, 22.06.2019 01:30, langel7373
Josie buys a pair of boots that retail for $52.00 dollars, however they are currently on sale for 25% off how much does josie pay for the boots if there is also a 6% sales tax on them
Answers: 1
Do you know the correct answer?
A group of engineers developed a new design for a steel cable. They need to estimate the amount of w...

Questions in other subjects:

Konu
Mathematics, 22.02.2021 18:20