Mathematics
Mathematics, 22.03.2021 19:20, matthew6889

A bicycle factory installs about 400 tires per day. Tires are installed Monday through Friday for 8 hours per day. The manager of the factory estimates the number of properly installed tires per week using the process below. In the first hour of work on Monday, 49 out of 50 tires were properly installed.

So, there were about 8(49) = 392 properly installed tires on Monday.

Considering 5 working days per week, 5(392) = 1,960 is the number of tires properly installed in one week.

Which best explains the validity of the results?
The results are likely invalid because it is unlikely that the tires installed in one hour on Monday will represent the entire population of tires.
The results are likely invalid because the entire population during one week was not part of the sample.
The results are likely valid because a large number of tires produced during the week were part of the sample.
The results are likely valid because each tire sampled was part of the population of tires that week.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, jimyyyy
Which composition of similarity transformations maps polygon abcd to polygon a'b'c'd'? a dilation with a scale factor less than 1 and then a reflection a dilation with a scale factor less than 1 and then a translation a dilation with a scale factor greater than 1 and then a reflection a dilation with a scale factor greater than 1 and then a translation
Answers: 3
image
Mathematics, 21.06.2019 17:50, tiffcarina69
F(x) = x2 βˆ’ 9, and g(x) = x βˆ’ 3 f(x) = x2 βˆ’ 4x + 3, and g(x) = x βˆ’ 3 f(x) = x2 + 4x βˆ’ 5, and g(x) = x βˆ’ 1 f(x) = x2 βˆ’ 16, and g(x) = x βˆ’ 4 h(x) = x + 5 arrowright h(x) = x + 3 arrowright h(x) = x + 4 arrowright h(x) = x βˆ’ 1 arrowright
Answers: 2
image
Mathematics, 21.06.2019 20:00, andrejr0330jr
I’m stuck on this equation, anyone got the answer?
Answers: 1
image
Mathematics, 21.06.2019 21:30, manou76
Mr. vector door is buying two new cowboy hats all together the hats cost $75.12 the second heart cost twice as much as the first hat what is the price of the more expensive at round to the nearest hundredth
Answers: 1
Do you know the correct answer?
A bicycle factory installs about 400 tires per day. Tires are installed Monday through Friday for 8...

Questions in other subjects:

Konu
Mathematics, 15.02.2021 18:30