Mathematics
Mathematics, 12.03.2021 21:50, alliemmaddox

P is able to do a piece of work in 15 days and Q can do the same work in 20 days. If they can work together for 4 days, what is the fraction of work left?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, cooboy
You have $600,000 saved for retirement. your account earns 5.5% interest. how much, to the nearest dollar, will you be able to pull out each month, if you want to be able to take withdrawals for 20 years?
Answers: 1
image
Mathematics, 21.06.2019 18:10, lulustar13
Television sizes are based on the length of the diagonal of the television's rectangular screen. so, for example, a 70-inch television is a television having a diagonal screen length of 70 inches. if a 70 inch television's diagonal forms a 29°angle with the base of the screen, what is the vertical height (1) of the screen to the nearest inch? 70 inhin
Answers: 3
image
Mathematics, 21.06.2019 19:00, ashrobbb
The annual snowfall in a town has a mean of 38 inches and a standard deviation of 10 inches. last year there were 63 inches of snow. find the number of standard deviations from the mean that is, rounded to two decimal places. 0.44 standard deviations below the mean 2.50 standard deviations below the mean 0.44 standard deviations above the mean 2.50 standard deviations above the mean
Answers: 3
image
Mathematics, 21.06.2019 19:40, giiffnlojd
Which is greater, 7 p 5 or 7 c 5? 7p5 7c5
Answers: 1
Do you know the correct answer?
P is able to do a piece of work in 15 days and Q can do the same work in 20 days. If they can work t...

Questions in other subjects: