SOS PLS HELP
A machine that drills holes for wells drilled to a depth of
-72 feet in one day...
Mathematics, 11.03.2021 03:30, vincentmoine
SOS PLS HELP
A machine that drills holes for wells drilled to a depth of
-72 feet in one day (24 hours).
At this rate, how many hours will it take until the drill
reaches its final depth of -132 feet?
Answers: 1
Mathematics, 22.06.2019 01:40, cfigueroablan
Which statement is true about the extreme value of the given quadratic equation? a. the equation has a maximum value with a y-coordinate of -21. b. the equation has a maximum value with a y-coordinate of -27. c. the equation has a minimum value with a y-coordinate of -21. d. the equation has a minimum value with a y-coordinate of -27.
Answers: 1
Mathematics, 22.06.2019 03:50, allieb12334
What are the domain and range of the function below? a) domain: (-4,0) range: [-2,infinity) b) domain: (-3,0) range: [-2,infinity) c) domain: (-infinity, infinity) range: [-2, infinity) d) domain: [-2,infinity) range: (-infinity, infinity)
Answers: 1
Mathematics, 22.06.2019 04:30, glocurlsprinces
Consider the linear model for a two-stage nested design with b nested in a as given below. yijk=\small \mu + \small \taui + \small \betaj(i) + \small \varepsilon(ij)k , for i=1,; j= ; k=1, assumption: \small \varepsilon(ij)k ~ iid n (0, \small \sigma2) ; \small \taui ~ iid n(0, \small \sigmat2 ); \tiny \sum_{j=1}^{b} \small \betaj(i) =0; \small \varepsilon(ij)k and \small \taui are independent. using only the given information, derive the least square estimator of \small \betaj(i) using the appropriate constraints (sum to zero constraints) and derive e(msb(a) ).
Answers: 2
History, 10.07.2019 21:30
Spanish, 10.07.2019 21:30