Mathematics
Mathematics, 09.03.2021 21:40, cyndiann2002

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 5 child bikes and 15 adult bikes in a week. No, because the bike order does not meet the restrictions of 4c + 6a ā‰¤ 120 and 4c + 4a ā‰¤ 100
No, because the bike order does not meet the restrictions of 4c + 4a ā‰¤ 120 and 6c + 4a ā‰¤ 100
Yes, because the bike order meets the restrictions of 4c + 6a ā‰¤ 120 and 4c + 4a ā‰¤ 100
Yes, because the bike order meets the restrictions of 4c + 4a ā‰¤ 120 and 6c + 4a ā‰¤ 100

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, gg808
Acircle has a diameter will endpoints of (-2,8) and (6, 4). what is the center of the circle
Answers: 1
image
Mathematics, 21.06.2019 17:00, afletcher2000
Jasmine wants to eat at 8: 00pm her meal takes 65mins to cook what time does she need to put the meal in the oven
Answers: 2
image
Mathematics, 22.06.2019 00:00, chaseking120418
If (x + 8) is a factor of f(x), which of the following must be true? both x = ā€“8 and x = 8 are roots of f(x). neither x = ā€“8 nor x = 8 is a root of f(x). f(ā€“8) = 0 f(8) = 0
Answers: 3
image
Mathematics, 22.06.2019 01:20, SL10355
Consider the image of klmn for the translation (x, y) ā†’ (x ā€“ 2, y ā€“ 1). what is the ordered pair of lā€²?
Answers: 1
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Chemistry, 19.03.2021 02:00
Konu
Mathematics, 19.03.2021 02:00