Mathematics
Mathematics, 08.03.2021 22:50, miguel454545

Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mechanic charges $85 per hour for his labor, write an equation that relates Dwayne's total cost(t) to the number of hours (h) the mechanic works. 1. What is the beginning value or b or y-intercept?

2. What is the rate per hour or slope or m?

3. Put the two values in the equation y=


Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mec

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, baby851
What is the sum of these mixed numbers 2 1/8 + 4 3/8
Answers: 1
image
Mathematics, 21.06.2019 18:30, lionscoachjose
Tod does not have any cookies. david gives jeff 8 cookies. then he splits half of the cookies he has left with tod. david let’s c represent the number of cookies that he starts with. he finds the number of cookies that tod has is 1/2 the difference of c and 8. write an expression to represent the number of cookies that tod has.
Answers: 2
image
Mathematics, 21.06.2019 18:30, makayyafreeman
Solve the inequality and graph 6j - 7 < 5
Answers: 1
image
Mathematics, 21.06.2019 20:30, chicalapingpon1938
Janet is rolling a number cube with the numbers one through six she record the numbers after each row if she rolls of keep 48 times how many times should she expect to roll a 4
Answers: 1
Do you know the correct answer?
Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mech...

Questions in other subjects:

Konu
Spanish, 17.10.2020 14:01
Konu
Mathematics, 17.10.2020 14:01
Konu
Mathematics, 17.10.2020 14:01