![Mathematics](/tpl/images/cats/mat.png)
Mathematics, 08.03.2021 20:00, sonyav732
In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minutes was required once a part entered the drill press but before its service could actually begin. When a setup is going on, regard the drill press as being busy. Plot the total number of parts in system as a function of simulated time. As numerical output performance measures, report the total production (number of parts produced), the average and maximum waiting time in queue, the average and maximum total time in system, the time-average and maximum number of parts in queue, and the drill-press utilization. Redo the hand simulation and discuss the results.
![answer](/tpl/images/cats/otvet.png)
Answers: 3
Other questions on the subject: Mathematics
![image](/tpl/images/cats/mat.png)
![image](/tpl/images/cats/mat.png)
Mathematics, 21.06.2019 19:30, sweetbri7p5v6tn
Aline passes through 3,7 and 6,9 what equation represents the line
Answers: 2
![image](/tpl/images/cats/mat.png)
Mathematics, 21.06.2019 21:30, lewisf5929
Vanessa earns a base salary of $400.00 every week with an additional5% commission on everything she sells. vanessa sold $1650.00 worth of items last week.
Answers: 2
Do you know the correct answer?
In the hand simulation of the simple processing system, suppose that a constant setup time of 3 minu...
Questions in other subjects:
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10
![Konu](/tpl/images/cats/en.png)
English, 02.06.2021 17:10
![Konu](/tpl/images/cats/mat.png)
Mathematics, 02.06.2021 17:10