Mathematics
Mathematics, 08.03.2021 19:20, davechucktaylor

A quality engineer is monitoring a process that produces tiing belts for automobiles. each hour he samples 4 belts from the production line and determines the average breaking strength for the sample. if the average is too low, then this is a signal that the process is not operating correctly and that adjustments need to be made, assume that when the process is working ocrrectly the probability of obtaining a sample that produces an average that is too low .025. assume that this probability remians the same for each sample drawn. a. Argue that X, the number of samples that are drawn in order to obtain the first sample that produces an average that is too low, follows the geometric distribution, and identify the numerical value of p.
b. Write the formula for the moment generating function for X.
c. On the average, how many samples will be drawn in order to obtain the first sample whose average is too low?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, josephmartinelli5
What is the prime factorization of 23 ?me with this question
Answers: 1
image
Mathematics, 21.06.2019 19:10, iziyahh902
How many solutions does the nonlinear system of equations graphed below have?
Answers: 2
image
Mathematics, 21.06.2019 20:00, trevorhenyan51
Ahiker stands at an unknown elevation before he ascends 2 miles up a mountain to an elevation of 9 miles. find the elevation of the hiker before his ascent.
Answers: 1
image
Mathematics, 21.06.2019 22:00, lraesingleton
What is the solution to the division problem below x3+x2-11x+4/x+4
Answers: 2
Do you know the correct answer?
A quality engineer is monitoring a process that produces tiing belts for automobiles. each hour he s...

Questions in other subjects:

Konu
Mathematics, 23.06.2019 03:00