Mathematics
Mathematics, 05.03.2021 20:50, vlactawhalm29

A school is implementing an SAT preparation program. To study the program's effectiveness. (point) the school looks at
participants' SAT scores before starting the program and after completing
the program
Out of 100 students sampled, 80 increased their scores, 10 kept their scores the same, and 10
decreased their scores. How could this situation be simulated using a random digit table?
Assign the digit 0 to students who increased their scores, 1 to students whose scores remained the same, and 2 to students whose scores decreased. Use the random digit table to generate
one-digit numbers, ignoring any values greater than 2.
Assign digits 0.1.2.3.4.5.6 and 7 to students who increased their scores. Assign 8 to students who kept their scores the same and 9 to students whose scores decreased. Use the random
digit table to generate one-digit numbers
Assign the number 80 to students who increased their scores, 10 to students whose scores remained the same, and 10 to students whose scores decreased. Use the random digit table to
generate two-digit numbers, ignoring any values besides 80 and 10
Assign digits 1, 2, 3, 4, 5, 6, 7 and 8 to students who decreased their scores. Assign 9 to students who kept their scores the same and 0 to students whose scores increased. Use the random
digit table to generate one-digit numbers

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, priceisright11401
Using the quadratic formula find the zeros of the given polynomial -5x^2+3x-11
Answers: 3
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
image
Mathematics, 21.06.2019 23:30, allisonlillian
The product of sin 30 degrees and sin 60 degrees is same as the product of
Answers: 1
image
Mathematics, 22.06.2019 00:00, tae1731
Plz hurry finals a paper cup in the shape of an inverted cone is 8 inches tall and has a radius of 1.5 inches. how much water can the cup hold? use 3.14 for pi. round the answer to the nearest tenth. a) 12.6 cubic in. b) 18.8 cubic in. c) 37.7 cubic in. d) 56.5 cubic in.
Answers: 2
Do you know the correct answer?
A school is implementing an SAT preparation program. To study the program's effectiveness. (point)...

Questions in other subjects:

Konu
Mathematics, 09.04.2021 14:00
Konu
Mathematics, 09.04.2021 14:00
Konu
Mathematics, 09.04.2021 14:00
Konu
Physics, 09.04.2021 14:00