Mathematics
Mathematics, 05.03.2021 18:10, abdullaketbi71

After the end of everyday, a production plant's maintenance crews check on the machinery and grade each item's state of repair. A particular robot arm can be given ve grades: Excellent, Good, Satisfactory, Watch, Failed. If the robot arm is tagged with a Failed grade, a crew will be sent the next day to repair it. There is about a 60% chance the crew will be successful in repairing the arm back to an Excellent condition. Otherwise, they have to try again the next day to x it. The general wear and tear of operation causes at most a single level of deterioration a day and this grade decrease happens about 25% of the time. During the day, the operators can tinker with the arm and are able to increase (if possible) the repair grade level 10% of the time. The operators cannot improve a Failed arm. Management wants to model the daily grade level of a robot arm. Required:
a. State any assumptions you need to utilize a Discrete Time Markov Chain.
b. What are the possible states of your DTMC?
c. Give the TPM.
d. Draw the TPD

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, liaholmes8
Given f(x)=2x^2-8x+6 and g(x)=3x-1 find f(x) +g(x) a. 2x^2+5x+5 b.2x^2-11x+7 c. 2x^2-5x+5 d.2x^2-5x-5
Answers: 1
image
Mathematics, 21.06.2019 17:00, yoongnzl
Solve with work both bert and ernie received an increase in their weekly salaries. bert's salary increased from $520 to $520. ernie's salary went from $580 to $645. find the percent of increase for each salary. what was the larger of the two percents ?
Answers: 1
image
Mathematics, 22.06.2019 00:00, hdwoody2002
Percy rides his bike 11.2 miles in 1.4 hours at a constant rate. write an equation to represent the proportional relationship between the number of hours percy rides, x, and the distance in miles, y, that he travels.
Answers: 1
image
Mathematics, 22.06.2019 03:30, chrissycherry
Find the cocordinatse of the point on y axis which is nearest to the point (-2,5)
Answers: 2
Do you know the correct answer?
After the end of everyday, a production plant's maintenance crews check on the machinery and grade e...

Questions in other subjects:

Konu
History, 19.02.2021 05:00
Konu
Mathematics, 19.02.2021 05:00
Konu
Advanced Placement (AP), 19.02.2021 05:00
Konu
Mathematics, 19.02.2021 05:00