For a large hotel construction job, a group of 11 workers completed 33 rooms in four weeks. If the company has to complete 57 rooms in the next four weeks, and the workers work at the same rate, how many workers are needed?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:50, mrhortert540
The parabola x = y² - 9 opens: a.)up b.)down c.) right d.)left
Answers: 1
image
Mathematics, 21.06.2019 19:00, bellbradshaw16
Suppose that one doll house uses the 1 inch scale, meaning that 1 inch on the doll house corresponds to 1/2 foot for life-sized objects. if the doll house is 108 inches wide, what is the width of the full-sized house that it's modeled after? in inches and feet.
Answers: 2
image
Mathematics, 21.06.2019 23:00, stodd9503
Frank has a devised a formula for his catering business that calculates the number of meatballs he needs to prepare. the formula is m=4a+2c, where c=number of children; m=number of meatballs; a=number of adults. how many meatballs are required for a party of 10 adults and 5 children?
Answers: 1
image
Mathematics, 22.06.2019 00:20, jjxt126
Acircle has a radius of 12.6cm what is the exact length of an arc formed by a central angle measuring 120
Answers: 1
Do you know the correct answer?
For a large hotel construction job, a group of 11 workers completed 33 rooms in four weeks. If the c...

Questions in other subjects: