Answers: 2
Mathematics, 21.06.2019 20:00, JOEFRESH10
The table shows the age and finish time of ten runners in a half marathon. identify the outlier in this data set. drag into the table the ordered pair of the outlier and a reason why that point is an outlier.
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 21:50, smithsa10630
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 1
Y=10-3x and y=1/2x-4 using substitution...
Business, 08.04.2020 09:50
English, 08.04.2020 09:50
Mathematics, 08.04.2020 09:50