Mathematics
Mathematics, 02.03.2021 07:00, nsg0686

The time required to process a shipment of goods at Wal- Mart varies directly with the number of items in
theshipment and inversely with the number of workers
assigned. If 15,000 items can be processed by 8 workers in
10 hours, then how long would it take 12 workers to
process 20,000 items?
6.5 hours
b) 7.75 hours
8.9 hours
d) 10.2 hours

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, valerieaj113
Weekly wages at a certain factory are normally distributed with a mean of $400 and a standard deviation of $50. find the probability that a worker selected at random makes between $450 and $500
Answers: 2
image
Mathematics, 21.06.2019 23:00, xxYingxYangxx7670
What is the location of point g, which partitions the directed line segment from d to f into a 5: 4 ratio? –1 0 2 3
Answers: 1
image
Mathematics, 21.06.2019 23:00, rosier2230
Someone answer this asap for the length, in feet, of a rectangular rug is represented by the expression 5x² + 2x. the width, in feet, is represented by the expression 3x². which expression represents the perimeter, in feet, of the rug? a. 8x² + 2x b. 8x² + 4x c. 16x² + 2x d. 16x² + 4x
Answers: 2
image
Mathematics, 22.06.2019 00:20, jjxt126
Acircle has a radius of 12.6cm what is the exact length of an arc formed by a central angle measuring 120
Answers: 1
Do you know the correct answer?
The time required to process a shipment of goods at Wal- Mart varies directly with the number of it...

Questions in other subjects:

Konu
History, 05.02.2021 18:20