Mathematics
Mathematics, 01.03.2021 23:50, manyah6189

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 00:20, tiana02q
Jeremy wants to determine the number of solutions for the equation below without actually solving the equation. which method should jeremy use?
Answers: 2
image
Mathematics, 22.06.2019 01:30, monica1400
Write the equation of the circle centered at (10,-2) with radius 2.
Answers: 2
image
Mathematics, 22.06.2019 01:50, BreBreDoeCCx
Without any equipment, you can see stars that are 2{,}800{,}0002,800,0002, comma, 800, comma, 000 light-years away. by looking through a small telescope, you can see stars that are 3{,}112{,}000{,}0003,112,000,0003, comma, 112, comma, 000, comma, 000 light-years away. approximately how many times as far can you see using a small telescope as without any equipment?
Answers: 3
image
Mathematics, 22.06.2019 03:00, davidoj13
Has a picture and need within 5 min
Answers: 2
Do you know the correct answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...

Questions in other subjects: