Mathematics
Mathematics, 23.02.2021 02:50, xojade

Robert takes 10 days more than Peter to complete a job. If they work together they will complete the job in 12 days. How long will Peter alone take to finish the job?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:10, kcarstensen59070
Anthony is making a collage for his art class my picking shapes randomly. he has five squares, two triangles, two ovals, and four circles. find p( circle is chosen first)
Answers: 1
image
Mathematics, 21.06.2019 19:00, Madsissabell
1) in triangle the, what is the measure of angle t (in degrees)? 2) in triangle bat, the measure of angle b is 66∘, and the measure of angle t is 77∘.what is the measure of the exterior angle at a (in degrees)?
Answers: 1
image
Mathematics, 21.06.2019 22:00, emadrid76
  cassidy wants to cut the yellow fabric into strips that are 0.3 yards wide. how many strips of yellow fabric can cassidy make? yellow fabric 16 yards for $108.00.
Answers: 1
image
Mathematics, 22.06.2019 06:30, AmityHeart
Jane evaluates x^2-3x+5 for x=2 below. step 1: (-2)^2-()+5 step 2: =-4+6+5 step 3: =7 what, if any, was jane’s mistake? a)jane made no mistakes. b)jane incorrectly evaluated(-2)^2 in step 2. c)jane incorrectly added the terms in step 3. d)jane incorrectly substituted in x=-2in step 1.
Answers: 2
Do you know the correct answer?
Robert takes 10 days more than Peter to complete a job. If they work together they will complete th...

Questions in other subjects:

Konu
Biology, 15.04.2020 00:34
Konu
English, 15.04.2020 00:34