Mathematics
Mathematics, 19.02.2021 06:30, grumpygreengori

A construction company can remove 1/2 metric tons of dirt from a construction site in 1/4 hours. What is the unit rate in metric tons per hour?
Write your answer in simplest form.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, ethangeibel93
What set does not contain -3 the set of all real numbers the set of all integers the set of all whole numbers the set of all rational numbers
Answers: 1
image
Mathematics, 21.06.2019 19:40, love0000
Atextile fiber manufacturer is investigating a new drapery yarn, which the company claims has a mean thread elongation of 12 kilograms with a standard deviation of 0.5 kilograms. the company wishes to test the hypothesis upper h subscript 0 baseline colon mu equals 12 against upper h subscript 1 baseline colon mu less-than 12 using a random sample of n equals 4 specimens. calculate the p-value if the observed statistic is x overbar equals 11.8. round your final answer to five decimal places (e. g. 98.76543).
Answers: 3
image
Mathematics, 21.06.2019 20:30, tyrique86
Daryl factors the polynomial p(x)=x3+x2−26x+24 to rewrite it as p(x)=(x+6)(x−4)(x−1). which equations must be true? there may be more than one correct answer. select all correct answers. p(1)=0 p(−4)=0 p(−1)=0 p(6)=0 p(4)=0 p(−6)=0
Answers: 1
image
Mathematics, 21.06.2019 21:00, famouzgal
Jordan got 27 out of 90 correct on his test . what fraction of the marks did her get correct
Answers: 2
Do you know the correct answer?
A construction company can remove 1/2 metric tons of dirt from a construction site in 1/4 hours. Wh...

Questions in other subjects:

Konu
Mathematics, 21.04.2020 02:34
Konu
Mathematics, 21.04.2020 02:35