Mathematics
Mathematics, 18.02.2021 23:20, hernandezbrandon059

When building a house, the number of days required to build is inversely roportional to with the number of workers. One house was built in 85 days by 5 workers. How many days would it take to build a similar house with 25 workers?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, kayladianemmp6qhfa
How do you do this geometry problem
Answers: 2
image
Mathematics, 21.06.2019 16:20, kingalex7575
Browning labs is testing a new growth inhibitor for a certain type of bacteria. the bacteria naturally grows exponentially each hour at a rate of 6.2%. the researchers know that the inhibitor will make the growth rate of the bacteria less than or equal to its natural growth rate. the sample currently contains 100 bacteria. the container holding the sample can hold only 300 bacteria, after which the sample will no longer grow. however, the researchers are increasing the size of the container at a constant rate allowing the container to hold 100 more bacteria each hour. they would like to determine the possible number of bacteria in the container over time. create a system of inequalities to model the situation above, and use it to determine how many of the solutions are viable.
Answers: 1
image
Mathematics, 21.06.2019 17:00, ronnie7898
How do i do this activity, is appreciated
Answers: 1
image
Mathematics, 21.06.2019 19:00, alaina3792
Lucy is a dress maker. she sews \dfrac47 7 4 of a dress in \dfrac34 4 3 hour. lucy sews at a constant rate. at this rate, how many dresses does lucy sew in one hour? include fractions of dresses if applicable
Answers: 3
Do you know the correct answer?
When building a house, the number of days required to build is inversely roportional to with the num...

Questions in other subjects:

Konu
Mathematics, 20.04.2022 23:20