Mathematics
Mathematics, 11.02.2021 23:50, Luciano4411

Two teams working together can finish a job in 8 days. If the first team works alone for two days and then second team works alone for 5 days, 5/8 of the total work still remains. How many days would it take each team to finish the work alone?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:50, paula1172
Astudent received the following grades last semester. find the student's semester grade point average. an a is algebra (3 credits), a b in history ( 3 credits), a in sociology ( 3 credits) a d in english ( 3credits) and a c in seminar ( 2credits). an a is worth 4 points, a b is worth 3 points a c is worth 2 points and a d is worth 1 point.
Answers: 2
image
Mathematics, 21.06.2019 16:00, pr47723
When turned about its axis of rotation, which shape could have created this three-dimensional object?
Answers: 3
image
Mathematics, 22.06.2019 00:40, yasarhan2
Solve the following system of equations express your answer as an ordered pair in the format (a, b) with no spaces between the numbers of symbols 5x+2y=22
Answers: 2
image
Mathematics, 22.06.2019 00:50, richard80
Match the following reasons with the statements given to create the proof. 1. do = ob, ao = oc sas 2. doc = aob given 3. triangle cod congruent to triangle aob vertical angles are equal. 4. 1 = 2, ab = dc if two sides = and ||, then a parallelogram. 5. ab||dc if alternate interior angles =, then lines parallel. 6. abcd is a parallelogram cpcte
Answers: 3
Do you know the correct answer?
Two teams working together can finish a job in 8 days. If the first team works alone for two days an...

Questions in other subjects: