Mathematics, 11.02.2021 20:30, pickelswolf5938
A leaky 10-kg bucket is lifted from the ground to a height of 12 m at a constant speed with a rope that weighs 0.5 kg/m. Initially the bucket contains 36 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 12-m level. Find the work done. (Use 9.8 m/s2 for g.) Show how to approximate the required work by a Riemann sum. (Let x be the height in meters above the ground. Enter xi* as xi.)
Answers: 3
Mathematics, 21.06.2019 20:00, CelesteN64
For problems 29 - 31 the graph of a quadratic function y=ax^2 + bx + c is shown. tell whether the discriminant of ax^2 + bx + c = 0 is positive, negative, or zero.
Answers: 1
Mathematics, 21.06.2019 21:30, joybeth9591
Iwill give brainliest. suppose tommy walks from his home at (0, 0) to the mall at (0, 5), and then walks to a movie theater at (6, 5). after leaving the theater tommy walks to the store at (6, 0) before returning home. if each grid square represents one block, how many blocks does he walk?
Answers: 2
Mathematics, 22.06.2019 00:30, bobby237065
Three friends are comparing the prices of various packages of golf balls at a sporting goods store. hector finds a package of 6 golf balls that costs $4.50.
Answers: 3
A leaky 10-kg bucket is lifted from the ground to a height of 12 m at a constant speed with a rope t...
Spanish, 13.10.2020 15:01
Mathematics, 13.10.2020 15:01
Mathematics, 13.10.2020 15:01
Mathematics, 13.10.2020 15:01
Mathematics, 13.10.2020 15:01
Social Studies, 13.10.2020 15:01