Mathematics
Mathematics, 09.02.2021 21:20, savannadutton8577

Workers at a quarry are removing rock at a daily rate of 0.1%. There are 3.2 tons of rock when the work begins. Which function can be used to find the number of tons of rock left at the end of d days?
A. m(d) = 3.2(0.999)^d
B. m(d) = 3.2(0.99)^d
C. m(d) = 3.2(1.01)^d
D. m(d) = 3.2(1.001)^d

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, mncampbell01
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
image
Mathematics, 21.06.2019 16:00, aahneise02
Write two subtraction equations that are equivalent to 5 + 12 = 17.
Answers: 2
image
Mathematics, 21.06.2019 16:20, TheVariableWhoLived
Ivan began dividing g2  – 6 by g + 1, noting that . he started by placing g in the quotient, as shown below. what is g2  – 6 divided by g + 1? g –  1 –  g + 1  – g  –  7 + g  –  5  + 
Answers: 3
image
Mathematics, 21.06.2019 17:10, Playboycxm
Consider the following equation -167 + 37 = 49 - 21p select the equation that has the same solution as the given equation. o a. p - 5 + ip = 7 - p ob. +55 + 12p = 5p + 16 c. 2 + 1.25p = -3.75p + 10 d. -14 + 6p = -9 - 6p reset next
Answers: 3
Do you know the correct answer?
Workers at a quarry are removing rock at a daily rate of 0.1%. There are 3.2 tons of rock when the w...

Questions in other subjects:

Konu
Social Studies, 22.06.2021 21:00