Mathematics
Mathematics, 03.02.2021 20:50, chaaaa

Q10. It takes 2 painters 4 days to compete a job. How long will it take 1 painter to complete the
same job?
What assumptions have you made?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, anabelleacunamu
Find the value of x. round the length to the nearest tenth
Answers: 1
image
Mathematics, 22.06.2019 00:30, luis83113
Afarm is to be built in the shape of quadrilateral abcd, as shown below. all four sides are equal. a rhombus abcd is shown with diagonal ac equal to 15.5 feet and diagonal bd equal to 13.2 feet. what is the area of the farm? pleas only pick from the 4 below 62 square feet 52.8 square feet 57.4 square feet 102.3 square feet
Answers: 2
image
Mathematics, 22.06.2019 04:30, glocurlsprinces
Consider the linear model for a two-stage nested design with b nested in a as given below. yijk=\small \mu + \small \taui + \small \betaj(i) + \small \varepsilon(ij)k , for i=1,; j= ; k=1, assumption: \small \varepsilon(ij)k ~ iid n (0, \small \sigma2) ; \small \taui ~ iid n(0, \small \sigmat2 ); \tiny \sum_{j=1}^{b} \small \betaj(i) =0; \small \varepsilon(ij)k and \small \taui are independent. using only the given information, derive the least square estimator of \small \betaj(i) using the appropriate constraints (sum to zero constraints) and derive e(msb(a) ).
Answers: 2
image
Mathematics, 22.06.2019 05:00, ssiy
A5 foot long board is propped against the wall of a house. the board forms a 60° angle with the ground. how far is the base of the board from the wall?
Answers: 3
Do you know the correct answer?
Q10. It takes 2 painters 4 days to compete a job. How long will it take 1 painter to complete the

Questions in other subjects:

Konu
Mathematics, 13.01.2021 04:00
Konu
Mathematics, 13.01.2021 04:00