Aconstruction crew needs to build a road that will be 20 miles long. the crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long. how much more road does the construction crew need to build?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:40, jetblackcap
Iam trying to solve a linear equation for the shoe size of someone 84" tall taking into consideration example 1 is 69" tall with a shoe size of 9 and example 2 is 72 inches tall with a shoe size of 11. i understand that the equation should be y=mx+b and that on the graph the answer is (3,2) but i just don't understand how to create the equation to solve for 84-inches and 60-inches tall questions. after two days, i need .
Answers: 2
image
Mathematics, 21.06.2019 18:00, wbrandi118
Solve the equation x/4 - 5= -8 -27 -12 -7 12
Answers: 2
image
Mathematics, 21.06.2019 21:00, jumeljean123oythxy
Kira looked through online census information to determine the overage number of people living in the homes in her city what is true about kira's data collection?
Answers: 1
image
Mathematics, 22.06.2019 03:00, sarath30
This size running track is usually called a 400 meter track. however if a person ran as close to the inside as possible on the track they would run less than 400 meters in one lap. how far away from the inside border would someone have to run to make one lap equal exactly 400 meters
Answers: 2
Do you know the correct answer?
Aconstruction crew needs to build a road that will be 20 miles long. the crew already completed a st...