Mathematics
Mathematics, 26.01.2021 19:40, NavyCo

8. Mr Smith, production manager claims the z score for a datum of 16 if the 1 point mean is 14 and the standard deviation is 0.6 would be
A. 0.25
B. 1.93
C. 3.33
D. D. -1

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:50, miacervenka
At a sand and gravel plant, sand is falling off a conveyor and onto a conical pile at a rate of 16 cubic feet per minute. the diameter of the base of the cone is approximately three times the altitude. at what rate is the height of the pile changing when the pile is 12 feet high? (hint: the formula for the volume of a cone is v = 1 3 πr2h.)
Answers: 3
image
Mathematics, 21.06.2019 20:00, oopsorry
James is playing his favorite game at the arcade. after playing the game 3 times, he has 8 tokens remaining. he initially had 20 tokens, and the game costs the same number of tokens each time. the number t of tokens james has is a function of g, the number of games he plays. write the function’s formula? t=
Answers: 1
image
Mathematics, 22.06.2019 01:00, rj1262004
What is the value of x? assume that the line is tangent to the circle.
Answers: 2
image
Mathematics, 22.06.2019 01:30, wendelljo61
David is standing on the sixth rung of a ladder while painting his house. which expressions represent a change in david’s position of 2 rungs on the ladder? choose exactly two answers that are correct. a. 6+2 b. 6-2 c. 2x6 d. 6/2
Answers: 1
Do you know the correct answer?
8. Mr Smith, production manager claims the z score for a datum of 16 if the 1 point mean is 14 and...

Questions in other subjects:

Konu
Mathematics, 12.02.2021 06:20