Mathematics
Mathematics, 25.01.2021 14:00, cbogrett

1. A worker in a company work 7 hours in a day, there are 22 working days in a month other than working hours each worker works 8 extra hours in a month, how many hours a worker is working in a full month?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:00, firefightergros7271
Match the vocabulary to the proper definition. in probability, two events in which 1. conditional probability the outcome of one event is independent of the outcome of a second event. 2. dependent events in probability, two events in which the outcome of one event is dependent on the outcome of a second event. the probability of an event in which the outcome of the event is conditional on the outcome of one or more different events. 3. independent events
Answers: 2
image
Mathematics, 22.06.2019 00:00, lllamasarebae5995
I've been working on this for a few days and i just don't understand, it's due in a few hours. you. the direction of a vector is defined as the angle of the vector in relation to a horizontal line. as a standard, this angle is measured counterclockwise from the positive x-axis. the direction or angle of v in the diagram is α.part a: how can you use trigonometric ratios to calculate the direction α of a general vector v = < x, y> similar to the diagram? part bsuppose that vector v lies in quadrant ii, quadrant iii, or quadrant iv. how can you use trigonometric ratios to calculate the direction (i. e., angle) of the vector in each of these quadrants with respect to the positive x-axis? the angle between the vector and the positive x-axis will be greater than 90 degrees in each case. part cnow try a numerical problem. what is the direction of the vector w = < -1, 6 > ?
Answers: 1
image
Mathematics, 22.06.2019 02:00, michaellowe8434
1. solve the system of equations by graphing: y = -3x - 3 m = b = y = 2x + 2 m = b = plz solve now
Answers: 1
image
Mathematics, 22.06.2019 03:00, davidoj13
Has a picture and need within 5 min
Answers: 2
Do you know the correct answer?
1. A worker in a company work 7 hours in a day, there are 22 working days in a month other than work...

Questions in other subjects:

Konu
Mathematics, 16.03.2020 04:53