Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 03:40, cherylmorton7302
Anull hypothesis states that the difference between 8 hours of sleep and 3 hours of sleep has no effect on the number of pictures a student will remember during a picture memory interface test (pmit). examining the mit database, an extremely small t-value of 0.1611 is found. this t-value is much smaller than the smallest t-value on the chart for p-value reference. from this information we can: select one: a. accept the null hypothesis because the p-value obtained shows that the difference between the two groups being tested is not statistically significant b. accept the null hypothesis because the p-value obtained was statistically significant c. reject the null hypothesis because of the p-value obtained d. reject the null hypothesis because the data obtained is statistically significant
Answers: 3
Mathematics, 22.06.2019 04:10, alfarodougoy8lvt
Acute identify < 1 and < 2 select all that apply of the following acute, right, obtuse, adjacent, vertical, complementary, supplementary
Answers: 2
2) 8(x - y); user-5, and y = 2...
Mathematics, 13.12.2020 02:20
Advanced Placement (AP), 13.12.2020 02:20
English, 13.12.2020 02:20
Mathematics, 13.12.2020 02:20
English, 13.12.2020 02:20
History, 13.12.2020 02:20