Mathematics
Mathematics, 21.01.2021 22:50, pcartei

A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new batch of glass sheets being produced using a sample of 18 sheets of glass. The actual distribution of this batch is unknown, but preliminary investigations show that a normal approximation is reasonable. The specialist decides to use a t- distribution rather than a z-distribution because (A) The z-distribution is not appropriate because the sample size is too small.
(B) The sample size is large compared to the population size.
(C) The data comes from only one batch.
(D) The variability of the batch is unknown.
(E) The t-distribution results in a narrower confidence interval.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:50, 1963038660
The perimeter of a rhombus with a side of 6 is 24
Answers: 1
image
Mathematics, 21.06.2019 16:20, lethycialee2427
Taking algebra two apex courses and need with these questions
Answers: 1
image
Mathematics, 21.06.2019 19:00, ktenz
Asmall business produces and sells balls. the fixed costs are $20 and each ball costs $4.32 to produce. each ball sells for $8.32. write the equations for the total cost, c, and the revenue, r, then use the graphing method to determine how many balls must be sold to break even.
Answers: 3
image
Mathematics, 21.06.2019 19:30, bakaoffire
Mr. brettler is hanging up a 5-foot tall rectangular welcome sign in the gym. he has drawn a sketch on a coordinate grid. he has the lower vertices of the sign at (9, –3) and (–6, –3). where would the upper vertices be on the grid?
Answers: 1
Do you know the correct answer?
A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new...

Questions in other subjects:

Konu
Biology, 23.09.2019 08:30