Consider the following work breakdown structure: Time Estimates (days) Activity Precedes Optimistic Most Likely Pessimistic Start A, B - - - A C, D 44 50 56 B D 45 60 75 C E 42 45 48 D F 31 40 49 E F 27 36 39 F End 58 70 82 What is the probability that the critical path for this project will be completed within 210 days

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:20, animegirl02
What is the equation and solution for the sentence? the sum of a number and thirty-one is one hundred thirteen. write the equation as n-31=113 and subtract 31 from both sides. the answer is 82. write the equation as n+31=113 and subtract 31 from both sides. the answer is 82. write the equation as n+31=113 and add 31 to both sides. the answer is 144. write the equation as n-31=113 and add 31 to both sides. the answer is 144.
Answers: 1
image
Mathematics, 21.06.2019 17:30, allisonlillian
Select the quadratic that has root x = 8 and x = -5
Answers: 3
image
Mathematics, 21.06.2019 17:40, JessicaSontay8841
Follow these steps using the algebra tiles to solve the equation −5x + (−2) = −2x + 4. 1. add 5 positive x-tiles to both sides and create zero pairs. 2. add 4 negative unit tiles to both sides and create zero pairs. 3. divide the unit tiles evenly among the x-tiles. x =
Answers: 2
image
Mathematics, 21.06.2019 23:30, Littllesue2
Find the measure of angle y. round your answer to the nearest hundredth. ( type the numerical answer only) a right triangle is shown with one leg measuring 5 and another leg measuring 14. an angle across from the leg measuring 5 is marked y degrees. numerical answers expected!
Answers: 1
Do you know the correct answer?
Consider the following work breakdown structure: Time Estimates (days) Activity Precedes Optimistic...

Questions in other subjects:

Konu
Mathematics, 16.12.2021 02:20