Mathematics
Mathematics, 14.12.2020 19:30, kimlyn58p0wyn0

A factory can produce two products, x and y, with a profit approximated by P=14x+22y−900
. The production of y must exceed the production of x by at least 100 units. Moreover, production levels are limited by the formula
x+2y≤1400.

Identify the vertices of the feasible region.
What production levels yield the maximum profit, and what is the maximum profit?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, malibu777
Asquare parking lot has 6,400 square meters what is the length in meters
Answers: 1
image
Mathematics, 21.06.2019 22:00, Emorej22
Find the maximum value of p= 4x + 5y subject to the following constraints :
Answers: 3
image
Mathematics, 22.06.2019 03:00, Kaycieb
Plz 20 points polynomials 1: subtract and simplify (–y^2 – 4y – 8) – (–4y^2 – 6y + 3) 2: multiply and simplify 2x^2 y^3 z^2 · 4xy^4 x^2 3: multiply and simplify (x – 4) (x2 – 5x – 6)
Answers: 1
image
Mathematics, 22.06.2019 06:30, hannahmayline
Which of these angles are supplementary? a. 100o and 90o b. 78o and 102o c. 54o and 146o d. 12o and 78o
Answers: 2
Do you know the correct answer?
A factory can produce two products, x and y, with a profit approximated by P=14x+22y−900
. Th...

Questions in other subjects:

Konu
Mathematics, 01.02.2021 06:50
Konu
Mathematics, 01.02.2021 06:50
Konu
Mathematics, 01.02.2021 06:50