Mathematics, 11.12.2020 07:10, Cassandoo
The daily cost of hiring an electrician, y, to work x hours on a repair project can be modeled using a linear function the electrician charges a fixed cost of $65 plus an additional cost of $35 per hour the electrician works a maximum of 8 hours per day for one day of work what is the range of the function for this situation.
Option 1: 0≤x≤8
Option 2: 0≤x≤10
Option 3: 65≤y≤345
Option 4: 35≤y≤520
Answers: 3
Mathematics, 21.06.2019 14:00, janetshirinyan
Which of the following is the missing term, a2, of the geometric sequence in which a1=2 and a3=200
Answers: 2
Mathematics, 21.06.2019 16:00, michellealvarez985
Quadrilateral wxyz is on a coordinate plane. segment yz is on the line x+y=7 and segment xw is on the line x+y=3. which statement proves how segments yz and xw are related
Answers: 1
Mathematics, 21.06.2019 19:30, leannamat2106
Which statements are true? check all that apply. the line x = 0 is perpendicular to the line y = –3. all lines that are parallel to the y-axis are vertical lines. all lines that are perpendicular to the x-axis have a slope of 0. the equation of the line parallel to the x-axis that passes through the point (2, –6) is x = 2. the equation of the line perpendicular to the y-axis that passes through the point (–5, 1) is y = 1.
Answers: 1
The daily cost of hiring an electrician, y, to work x hours on a repair project can be modeled using...
Mathematics, 12.02.2021 04:00
Advanced Placement (AP), 12.02.2021 04:00
Mathematics, 12.02.2021 04:00
Mathematics, 12.02.2021 04:00
Mathematics, 12.02.2021 04:00
Mathematics, 12.02.2021 04:00