Mathematics
Mathematics, 11.12.2020 06:40, isabelperez063

A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed on the sander. To make a shoe, 10 mins is needed on the lathe and 20 mins on the sander. The lathe operator works 6hrs/day and the sander operator works 7hrs/day. How many shoes and boots can they make in one day working at this capacity. Write 2 equations.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, angellll4455
Secant be and cf intersect at point d inside a what is the measure of cde
Answers: 1
image
Mathematics, 21.06.2019 23:30, cornpops1749
Graph the line with the given slope m and y-intercept b. m=-3,b=1
Answers: 1
image
Mathematics, 22.06.2019 02:10, zachspencer6444
What is the total surface area of the square pyramid
Answers: 2
image
Mathematics, 22.06.2019 04:30, EllaSue
0.75,1.75,2.75,3.75 is arithmetic or geometric?
Answers: 1
Do you know the correct answer?
A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed...

Questions in other subjects: