Mathematics
Mathematics, 10.12.2020 02:50, 20vmiller

A construction company charges $15 per hour for debris removal, plus a one-time fee for the use of a trash dumpster. The total fee for 9 hours of service is $195. Write the point-slope form of an equation to find the total fee y for any number of hours x

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:20, tmantooth7018
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
image
Mathematics, 21.06.2019 18:10, heybrothwrlogan
Points a, b, and c form a triangle. complete the statements to prove that the sum of the interior angles of triangle abc is 180
Answers: 1
image
Mathematics, 21.06.2019 19:30, book0001
The length of a shadow of the building is 36m. the length of the pole, which is perpendicular to the ground, is 1.9m. the length of the pole's shadow is 1.52m. what is the height of the building?
Answers: 1
image
Mathematics, 21.06.2019 20:00, Cassandoo
Select the number of ways in which a line and a circle can intersect
Answers: 3
Do you know the correct answer?
A construction company charges $15 per hour for debris removal, plus a one-time fee for the use of a...

Questions in other subjects:

Konu
Social Studies, 25.09.2019 21:30
Konu
Mathematics, 25.09.2019 21:30