Mathematics
Mathematics, 09.12.2020 17:30, bria58490

Three people need to peel 1000 potatoes working together. Stacey starts at 2 PM peeling 20 potatoes per hour. Rob starts at 3 PM peeling 30 potatoes per hour, and James starts at 4 PM peeling 40 potatoes per hour. If they work continuously, at what time will the 1000 potatoes be peeled ?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, mujithkalhan2762
Last saturday, the museum box office sold 281 tickets for a total of $3,954. adults ticket cost $15, and students ticket cost $12. how many of each kind of tickets were sold?
Answers: 1
image
Mathematics, 21.06.2019 16:20, starxx05235
Abank gives 6.5% interest per year. what is the growth factor b in this situation?
Answers: 3
image
Mathematics, 21.06.2019 16:30, Cinders13
The radius of the circle is 4 cm and the measure of the central angle is 90° the area of the sector with a central angle measuring 90° and radius of length 4 cm is vt cm the triangle in the sector is 4 cm the area of the triangle is v/cm² the area of the segment of the circle is (471 - ) cm?
Answers: 1
image
Mathematics, 21.06.2019 18:40, bankskry
That table shows measurements (in invhes$ from cubes with different side lengths. which pairs of variables have a linear relationship? check all that apply
Answers: 3
Do you know the correct answer?
Three people need to peel 1000 potatoes working together. Stacey starts at 2 PM peeling 20 potatoes...

Questions in other subjects:

Konu
Mathematics, 22.08.2019 12:10