Mathematics
Mathematics, 03.12.2020 16:00, jones03riley

A bakery is making apple pies and carrot cakes. Each apple pie nets $5 profit. For each carrot cake, they
make $10 profit. Each pie take 4 hours to prepare and
1.5 hours to bake. The carrot cakes take 0.5 hours to
prepare and 0.5 hours to bake. The maximum
preparation time is 20 hours. The maximum baking
time is 10 hours. How many pies and cakes should be
made to maximize profits?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, DerikF9478
Saline iv fluid bags cost $64.20 for 24, 1000 ml bags from one supplier. another supplier sells 500 ml bags for $2 each. the hospital uses about 10,000, 1000 ml bags each month. nurses report that about half of the bags are more than half full when they are discarded. if you are going to use only one supplier, which would you choose and how much would you save with that choice? show calculator try it! if you buy 1000 ml bags, how many do you need to buy each month? type your answer in the space provided and click on the check answer button.
Answers: 3
image
Mathematics, 21.06.2019 18:30, PineaPPle663
Which one ? is the answer and how to find this answer
Answers: 2
image
Mathematics, 21.06.2019 18:30, hsjsjsjdjjd
Iam a rectangle. my perimeter is 60 feet. how much are do i cover?
Answers: 1
image
Mathematics, 21.06.2019 18:30, Jenniferwolf
Ametal rod needs to be 9 feet and 5.5 inches in length. the sections of the poles being used are each 1 foot and 10.5 inches long. how many 1ft 10.5in sections would be needed to complete the 9ft 5.5in metal rod? and how many inches of material will be left?
Answers: 1
Do you know the correct answer?
A bakery is making apple pies and carrot cakes. Each apple pie nets $5 profit. For each carrot cake...

Questions in other subjects:

Konu
Mathematics, 10.02.2020 21:33