Mathematics
Mathematics, 03.12.2020 09:30, kingtaco321

A construction crew is lengthening a road. The road started with a length of 51 miles, and the crew is adding 2 miles to the road each day. Let L represent the total length of the road (in miles), and let D represent the number of days the crew has worked. Write an equation relating L to D. Then use this equation to find the total length of the road after the crew has worked 34 days.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, 420420blazee
You were told that the amount of time lapsed between consecutive trades on the new york stock exchange followed a normal distribution with a mean of 15 seconds. you were also told that the probability that the time lapsed between two consecutive trades to fall between 16 to 17 seconds was 13%. the probability that the time lapsed between two consecutive trades would fall below 13 seconds was 7%. what is the probability that the time lapsed between two consecutive trades will be between 14 and 15 seconds?
Answers: 3
image
Mathematics, 21.06.2019 19:10, dylancasebere
What is the quotient of m^6/5 รท 5/m^2? assume m does not equal pl
Answers: 1
image
Mathematics, 21.06.2019 22:20, AliMe52
Atriangle has verticals at b(-3,0), c(2,-1), d(-1,2). which transformation would produce an image with verticals bโ€(-2,1), cโ€(3,2), dโ€(0,-1)?
Answers: 2
image
Mathematics, 21.06.2019 23:50, trippie4life
Determine the area of a triangle with (see picture below)
Answers: 1
Do you know the correct answer?
A construction crew is lengthening a road. The road started with a length of 51 miles, and the crew...

Questions in other subjects:

Konu
Mathematics, 24.04.2020 16:45
Konu
History, 24.04.2020 16:45