Mathematics
Mathematics, 19.11.2020 20:30, asanchez4292

a cereal packaging machine can fill 15 oz boxes at rate of 3 boxes every 2 minutes. Production has scheduled 600 lbs to be processed during each 8-hour shift. approximately how many minutes of down time will the machine have during each shift?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, queenofspades
Saline iv fluid bags cost $64.20 for 24, 1000 ml bags from one supplier. a new supplier sells 500 ml bags for $2 each. the hospital uses about 10,000, 1000 ml bags each month. nurses report that about half of the bags are more than half full when they are discarded. if you are going to use only one supplier, which size bag provides the best deal, and how much will you save each month? compare the cost of the new supplier to the current one.
Answers: 1
image
Mathematics, 21.06.2019 23:30, shady1095
Dots sells a total of 279 t-shirts ($2) and shorts ($4). in april total sales were $670. how many t-shirts and shorts did dots sell?
Answers: 1
image
Mathematics, 22.06.2019 00:30, alxiar19
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
image
Mathematics, 22.06.2019 01:30, skyhighozzie
What is the solution for the following system of equations? use any method to solve. 2x + 8y = 4 x = -3y + 5 question 4 options: x = 14, y= -3 x = 2, y = -3 x = -3, y = -3 x = 12, y = 5
Answers: 1
Do you know the correct answer?
a cereal packaging machine can fill 15 oz boxes at rate of 3 boxes every 2 minutes. Production has s...

Questions in other subjects:

Konu
Mathematics, 04.12.2020 09:20
Konu
Mathematics, 04.12.2020 09:20
Konu
Mathematics, 04.12.2020 09:20