Mathematics
Mathematics, 17.11.2020 23:00, andrewisboss59

1. The Perfect Circle Company manufactures bushings. Once each hour a sample of 125 finished bushings is drawn from the output; each bushing is examined by a technician. Those which fail are classified as defective; the rest are satisfactory. Here are data on ten consecutive samples taken in one week: Sample no. 1 2 3 4 5 6 7 8 9 10
Defective 15 13 16 11 13 14 20 25 30 45

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:50, fansofboys
I'm terrible at math any here is appreciated.
Answers: 2
image
Mathematics, 21.06.2019 18:50, hartmaaj95
The first few steps in solving the quadratic equation 9x2 + 49x = 22 ? 5x by completing the square are shown. 9x2 + 49x = 22 ? 5x 9x2 + 54x = 22 9(x2 + 6x) = 22 which is the best step to do next to solve the equation by completing the square? 9(x2 + 6x + 3) = 25 9(x2 + 6x + 3) = 49 9(x2 + 6x + 9) = 31 9(x2 + 6x + 9) = 103
Answers: 3
image
Mathematics, 21.06.2019 19:00, kadams3836
The length of a rectangular piece of land is 92 yards more than three times its width. the perimeter is 760 yards. find its dimensions.
Answers: 1
image
Mathematics, 22.06.2019 00:30, krojas015
The power generated by an electrical circuit (in watts) as a function of its current c (in amperes) is modeled by p(c)= -15c(c-8) what current will produce the maximum power?
Answers: 1
Do you know the correct answer?
1. The Perfect Circle Company manufactures bushings. Once each hour a sample of 125 finished bushing...

Questions in other subjects:

Konu
Mathematics, 05.02.2020 06:01