Mathematics
Mathematics, 17.01.2020 11:31, alexabdercmur

Aceramics workshop makes wreaths, trees and sleighs for sale at christmas. a wreaths takes 3 hours, 2 hours to paint, and 9 hours to fire. a tree takes 15 hours to prepare, 3 hours to paint , and 4 hours to fire. a sleigh takes 4 hours to prepare, 14 hours to paint, and 7 hours to fire. if the workshop has 114 hours for preparation time, 15 hours for painting, and 122 hours for firing, how many of each can be made ?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:40, kdior27
The standard distance between studs in a house is 1.5 feet. if you have a set of blueprints for a house that mark every 1.5 feet with 2 in., by how many inches will a 13-foot wall be represented?
Answers: 3
image
Mathematics, 21.06.2019 18:30, issagirl05
Find the exact value of each of the following. in each case, show your work and explain the steps you take to find the value. (a) sin 17Ο€/6 (b) tan 13Ο€/4 (c) sec 11Ο€/3
Answers: 2
image
Mathematics, 21.06.2019 18:30, angelina6836
Anormally distributed data set has a mean of 176.3 and a standard deviation of 4.2. what is the approximate z-score for the data value of 167.9? 2.00 βˆ’2.00 8.4 βˆ’8.4
Answers: 2
image
Mathematics, 21.06.2019 19:50, GbTaco
Table which ratio is equivalent to 3: 7? 6: 7 3: 21 24: 56 15: 30
Answers: 1
Do you know the correct answer?
Aceramics workshop makes wreaths, trees and sleighs for sale at christmas. a wreaths takes 3 hours,...

Questions in other subjects:

Konu
Physics, 21.02.2020 07:16