Mathematics, 03.11.2020 16:30, ArmyAllen00
Romi, a production manager, is trying to improve the efficiency of his assembly line. He knows that the machine is set up correctly only 70% of the time. He also knows that if the machine is set up correctly, it will produce good parts 95% of the time, but if set up incorrectly, it will produce good parts only 40% of the time. Romi starts the machine and produces one part before he begins the production run. He finds the first part to be good. Using Bayes theorem, what is the revised probability that the machine was set up correctly?
Answers: 2
Mathematics, 21.06.2019 14:00, joemoe15jr
Two sides of a triangle mesure 20cm and 30cm. what is the measure of the third side
Answers: 3
Mathematics, 21.06.2019 18:10, chyyy3
The means and mean absolute deviations of the individual times of members on two 4x400-meter relay track teams are shown in the table below. means and mean absolute deviations of individual times of members of 4x400-meter relay track teams team a team b mean 59.32 s 59.1 s mean absolute deviation 1.5 s 245 what percent of team b's mean absolute deviation is the difference in the means? 9% 15% 25% 65%
Answers: 2
Mathematics, 22.06.2019 00:30, ElizabethF
What is the interquartile range of this day at set?
Answers: 1
Romi, a production manager, is trying to improve the efficiency of his assembly line. He knows that...
Mathematics, 26.09.2019 15:00