Mathematics
Mathematics, 30.10.2020 22:20, lol6998

Three contractors' charges are modeled using functions, where x is the total number of hours worked. Contractor A: f(x)=400+65x
Contractor B: g(x)=78x
Contractor ChX)=1000+55x
What is the order of contractors from lowest hourly cost to highest hourly cost?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, sciencecreation87
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
image
Mathematics, 21.06.2019 18:30, kenzie9493
Write a polynomial function f of least degree that has rational coefficients, a leading coefficient of 1, and the given zeros. 3, 4+2i, 1+(sqrt)7 the answer is supposed to be: f(x)=x(^5)-13x(^4)+60x(^3)-82x(^2)- 144x+360 what am i doing wrong?
Answers: 1
image
Mathematics, 21.06.2019 18:30, Jenniferwolf
Ametal rod needs to be 9 feet and 5.5 inches in length. the sections of the poles being used are each 1 foot and 10.5 inches long. how many 1ft 10.5in sections would be needed to complete the 9ft 5.5in metal rod? and how many inches of material will be left?
Answers: 1
image
Mathematics, 21.06.2019 19:30, kristofwr3444
Acar started driving from city a to city b, distance between which is 620 miles, at a rate of 60 mph. two hours later a truck left city b and started moving towards city a at a rate of 40 mph. how many hours after the truck's departure will the two meet?
Answers: 1
Do you know the correct answer?
Three contractors' charges are modeled using functions, where x is the total number of hours worked....

Questions in other subjects: