Mathematics
Mathematics, 30.10.2020 17:30, ketabug50

Efficiency Studies A division of a certain toy company manufactures an electronic football game. An efficiency study showed that the rate at which the games are assembled by the average worker t hr after starting work at 8 A. M. is− 32t2 + 4t + 25 (0 ≤ t ≤ 4)units/hour.(a)Find the total number of games the average worker can be expected to assemble in the 4 hr morning shift. units(b)How many units can the average worker be expected to assemble in the first hour of the morning shift? unitsHow many units can the average worker be expected to assemble in the second hour of the morning shift? units

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, jjmarie612
Solve the system of equations. y= 2x y= x^2 - 15
Answers: 1
image
Mathematics, 21.06.2019 17:00, love12236
What expression is equivalent to (2x-1)(x-3)?
Answers: 1
image
Mathematics, 21.06.2019 17:50, amcdonald009
To solve the system of equations below, grace isolated the variable y in the first equation and then substituted into the second equation. what was the resulting equation? 3y=12x x^2/4+y^2/9=1
Answers: 1
image
Mathematics, 22.06.2019 04:20, blueval3tine
The width of a piece of rectangular land is 5m shorter rhan 1/3 of its length .find the width of the land if the length is 60m,150m.
Answers: 2
Do you know the correct answer?
Efficiency Studies A division of a certain toy company manufactures an electronic football game. An...

Questions in other subjects:

Konu
Mathematics, 24.03.2021 14:00
Konu
Mathematics, 24.03.2021 14:00
Konu
Mathematics, 24.03.2021 14:00