Mathematics
Mathematics, 28.10.2020 17:00, xojade

In a building construction project, the on-time completion of the building requires the successive completion of a series of activities. Define E = excavation completed on time; and P[E] = 0.8 F = foundation completed on time; and P[F] = 0.7 S = superstructure completed on time; and P[S] = 0.9 Assume statistical independence among these events.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, isabelsmhl
To make a monster appear large in a movie, a human actor wore a costume and walked through a scale model of a city. the scale used was 1 inch = 15 feet. the actor is 60 inches tall. how tall does the monster appear in the movie? question 5 options: 720 feet 75 feet 4 feet 900 feet
Answers: 2
image
Mathematics, 22.06.2019 02:50, JS28boss
How do you find p(a and b) if a and b are independent events for two or more actions, such as tossing a coin twice and finding p(heads and heads)? 2. how do you find p(a or b) if a and b are independent events for one action, such as spinning a four-color spinner once and finding p(red or blue)?
Answers: 1
image
Mathematics, 22.06.2019 04:10, kelseybieberrr19
Find the radius of a circle that has a circumference of 16. the formula for the circumference of a circle is c = 2tr, where r is the radius and c is the circumference. the equation solved for r is r = c over 2π. r=4 r= 8 r=12 r= 16
Answers: 1
image
Mathematics, 22.06.2019 05:10, montgomerykarloxc24x
Let b(t) be the number of unread books remaining on alex's bookshelf after reading consistently for t months. so, b(9) = . this means that , the .
Answers: 3
Do you know the correct answer?
In a building construction project, the on-time completion of the building requires the successive c...

Questions in other subjects: