Mathematics, 23.10.2020 17:20, isabelleecurtis
NEED ANSWER ASAP In order to surface the basketball court, a contractor charges D dollars, puls $30 per hour for a job. The equation C=30h+D decribes the cost, c for a job that takes h hours. Rewrite the equation so that we can find how many hours he works if he gets payed $470
Answers: 3
Mathematics, 21.06.2019 21:30, paolacorazza
Miss henderson wants to build a fence around a rectangular garden in her backyard in the scale drawing the perimeter of the garden is 14 in of the actual length of a b is 20 ft how many feet of fencing what you need
Answers: 3
Mathematics, 21.06.2019 22:30, cramirezorozco392
Whit h equation best represents this situation the number 98 increased by an unknown number equal to 120
Answers: 1
NEED ANSWER ASAP
In order to surface the basketball court, a contractor charges D dollars, puls $30...
Chemistry, 01.04.2021 01:00
Physics, 01.04.2021 01:00
Mathematics, 01.04.2021 01:00
Mathematics, 01.04.2021 01:00